●Peng X Y,Liang G C,Jin T Y,et al. Correlation of initiation of corrosion pits andmetallurgical
features of X100 pipeline steel[J]. Canadian Metallurgical Quarterly,2013,52(4):484-487.(SCI收錄)
●Peng X Y,Cheng Y F. A comparison of hydrogen permeation and the resulting
corrosion enhancement of X65 and X80 pipeline steels[J]. Canadian Metallurgical
Quarterly,2014,53(1):125-128.(SCI收錄)
●Liang G C,Peng X Y,San J E,et al. Strain aging of X100 steel in service and the enhanced
susceptibility of pipelines to stress corrosion cracking[J]. Journal of
Materials Engineering and Performance,2013,2013(22):3778-3782.(SCI收錄)
●Liang G C,Peng X Y,Xu L Y,et al.
Erosion-corrosion of carbon steel pipes in oil sands slurry studied by
weight-loss testing and CFD simulation[J]. Journal of Materials Engineering and
Performance,2013,2013(22):3043-3048.(SCI收錄)
●Peng X Y,Zhang P,Yu J S,et al.
Oil/gas pipeline typical third-party endanger reliability research considering
failure transfer Model Correlation[J]. ICPTT 2011.(EI收錄)
●Peng X Y,Zhang P,Song R S. Integrity management system model design and development
for new oil and gas long-distance pipeline[R].Shanghai:Proceedings of ASCE International
Pipelines and Trenchless Technology Conference(ASCE 2009),October 19-21,2009.(EI收錄)
●Zhang P,Song R S,Peng X Y. The analysis of seismic
vulnerability for oil and gas long distance pipeline based on holistic risk
fuzzy analytical approach[R]. Shanghai:Proceedings of ASCE International Pipelines and Trenchless
Technology Conference(ASCE 2009),October 19-21.(EI收錄)
●Peng X Y,Zhang P. Long-distance oil/gas pipeline failure rate prediction
based on fuzzy neural network model[R]. California:Proceedings of WRI World congress
on Computer Science and Information Engineer(CSIE 2009) IEEE Computer Society Order Number P3507,March 31-April 2,2009.(EI收錄)
●Peng X Y,Zhang P,Yu J S,et al. Based
on dempster-shafer evidence conflict theory and fault tree to estimate oilgas
pipeline reliability[R]. Beijing:Proceedings of 2008 International Conference on Risk and Reliability
Management,November10-12,2008:689-693.
●Zhang P,Peng X Y,Li X Q. Oil and gas pipeline limited charge optimum maintenance
decision-making analysis based on fuzzy-gray-element theory and fuzzy
analytical hierarchy process[R]. Guangzhou:Proceeding of second International Conference of Fuzzy Information
and Engineering (ICFIE'07),13-16 May 2007:455-463.
●Zhang P,Peng X Y,Li X Q,et al. The
Application of d-s theory on expert information in the calculation of failure
probability of pipeline[R]. BeiJing:INTERACTION of SCIENCE, TECHNOLOGY and ENGINEERIONG,Proceedings of the Seven International Conference on Reliability, Maintainability and Safety,22-26 August,2007:162-166.
●Peng X Y,Zhang P,Fan Z G,et al. Based on fault tree method to calculate pipeline failure
probability under evidence conflict[R]. Beijing:Proceedings of The First International Forum on Petroleum
Sustainable Development for Ph.D.Candidates,13-15 August,2007:208-209.